Installing oil rigs in the middle of the ocean is a highly complex process that involves specialized engineering and technology. Here’s an overview of how it's done:

1. Site survey and Planning
Before installation, experts conduct extensive geological and environmental surveys to assess the seabed and the oil reservoir. They also consider weather conditions, ocean currents, and water depth.

2. Choosing the Rig Type
The type of oil rig used depends on the water depth:

Shallow waters: Fixed platforms or jack-up rigs are commonly used. These rigs have legs that are lowered onto the seabed for stability.

Deep waters: Floating rigs like semi-submersibles or drillships are used. These are anchored to the seabed using mooring lines or dynamic positioning systems.

3. Transporting the Rig
Large construction vessels or tugs transport the rig to the designated location. Floating rigs are either towed or self-propelled to the site.

4. Anchoring and Securing
Fixed platforms: Pile drivers embed large steel or concrete piles into the seabed to anchor the platform.
Floating rigs: Anchors or dynamic positioning thrusters stabilize the rig and keep it in place.

5. Drilling
Once the rig is in position, a drilling system is lowered through the water to begin extracting oil. Drilling pipes and tools are used to bore into the seabed, reaching the oil reservoir.

6. Production Setup
After drilling, production equipment, pipelines, and safety systems are installed to extract and transport the oil.

Each rig is engineered to handle extreme ocean conditions, including high winds, waves, and underwater pressure.